[单选题]

In requirements engineering, requirements elicitation is the practice of collecting the requirements of a system from users, customers and other stakeholders. In the following practices, () is rarely used in requirements elicitation.

A . brain storming

B . interview

C . questionnaire

D . Monte Carlo analysis

参考答案与解析:

相关试题

In which phase of the software engineering process is the Software Requirements Specification develo

[单选题]In which phase of the software engineering process is the Software Requirem

  • 查看答案
  • Software engineering is the study andapplication of engineering to the (),development and maintenanc

    [单选题]Software engineering is the study andapplication of engineering to the (),d

  • 查看答案
  • In software engineering and systems engineering, ( ) , is adescription ofa system′ sbehavior as it r

    [单选题]In software engineering and systems engineering, ( ) , is adescription ofa

  • 查看答案
  • What is the minimum requirement of a GMD

    [单选题]What is the minimum requirement of a GMDSS operator?A.GMDSS operator licenseB.Third officer licenseC.General Radiotelephone Operator license and Radar EndorsementD.General Radiotelephone license or First or Second Class Radiotelegraph license with GM

  • 查看答案
  • The first requirement for logical troubl

    [单选题]The first requirement for logical troubleshooting of any system is the ability toA.collect all available data on a casualtyB.recognize normal operationC.identify the probable cause of a symptomD.isolate the faulty component

  • 查看答案
  • The purpose of the requirements definiti

    [单选题]The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an i

  • 查看答案
  • The purpose of the requirements definit

    [单选题]The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable (66) of the technical requirements for the software product.D.uring the requirements definition phase,the requirements definition team uses an ite

  • 查看答案
  • Note: requirement (a) includes 4 profess

    [试题]Note: requirement (a) includes 4 professional marks.A. central feature of the performance measurement system at TSC is the widespread use of league tables that displayeach depot’s performance relative to one another.Required:(b) Evaluate the potential

  • 查看答案
  • DRP(distribution requirement planning)是(

    [单选题]DRP(distribution requirement planning)是()A .分配需求计划B .配置管理计划C .配送需求计划D .配送管理计划

  • 查看答案
  • The officer in charge of the engineering

    [单选题]The officer in charge of the engineering watch shall notify the chief engineer without delay ____.A.in any emergency or if in any doubt as to what decision or measures to takeB.in the event of any impending action in machinery spaces that may cause r

  • 查看答案